METRO Elliniko Monitoring

Next Previous

Click to enlarge

Software

Terramove Greece

Project Description

The contract related to the extension to ELLINIKO was signed on March 8th 2006. The extension is 5,5 km long in total and includes 4  stations: ILIOUPOLI, ALIMOS, ARGYROUPOLI and ELLINIKO, as well as an underground area for the stabling of eight trains.Each one of the new stations is 110m long, it shall consist in three levels and there will be entrances/exits on either side of Vouliagmenis Avenue. The tunnel was bored using a TΒΜ-ΕΡΒ boring machine, whose cutter head was 9,5m in diameter. The stations, the ventilation and E/M shafts, as well as the train stabling area was constructed using the C/C method.

 

Customer

AKTOR

Authority

ATTIKO METRO

Location

ATHENS - ELLINIKO

Video
Location on the map

Project Progress
WorkDate
Start of ConstructionΤετάρτη, 08 Μάρτιος 2006